We officially started our Bathroom #2 renovation the first week of September 2010 while the kids were on a break from school. We had this vision that we'd start and finish in a couple weeks. HA HA! Just like ALL the other rooms in this home, we discovered there's much more to the updates than we realized once we started, and the length of time it would take would be much longer than we expected.
Bathroom #2 took 6 weeks of hardcore demo and reconstruction before we could install the toilet and sink to even begin using part of the space again; that means six people coordinating bathroom time and showers in one bathroom (we just got done doing that with the first bathroom renovation). We've learned to persevere because time has not been our friend when it comes to fixing, updating and transforming this home. 10 weeks after we began this Bathroom project- I am able to take good "AFTER" pictures. With the exception of a few painting details, a small piece of molding to install, and several knobs on the built-in cabinet, we are done with Bathroom #2.
Bathroom "L-shaped"
(9' 4" x 4' 9", measurement does not include "L" and built-in)
BEFORE and AFTER

The kids picked out the "cool" shade of blue on the wall~ "Aqua Ice" by Kilz. The mirror has a recessed cabinet in the wall.
This is a close up of the corner of the floor by the bathtub that had rotted. What you can't tell by the photo is the corner space is stuffed with steel wool and is about 1" x 2" . When the steel wool is pulled out, you're able to look straight to the ground.
Repaired with 3/4" new plywood sub-floor, then a layer of cement board for the tile to be installed on top of that.
Looking very pretty.
This original built-in cabinet had five layers of different colors of paint from over the many years of it's life (I sanded a small section to investigate). Since the layers of paint most likely contains some lead, we chose to repaint! The piece went from an antique cream color...
...to an "Ultra Pure White" semi gloss, just like the trim. What a difference a fresh coat of paint makes. New hinges and knobs (still needed to be installed), give this original built-in cabinet the face lift it needed.
...love all the storage space. The bottom cupboard space was originally a wood hamper (which smelled musty and not practical). We converted the old hamper to a storage for toilet paper and cleaner- salvaged the original front of the hamper and added a hinge.
Looking into the bathroom from the hall.
The bath tub had seen better days.
New and fresh.